📋 Last Planner System
22 tools compared
🔧 Tools in Last Planner System
inTakt
A purpose-built Takt planning tool for construction professionals.
Miro
A versatile online whiteboard that can be used for digital pull planning.
Outbuild
An all-in-one Last Planner System software for construction planning and scheduling.
Aphex
A web-based platform for short-term construction planning and look-aheads.
Touchplan
Cloud-based construction planning software designed for the Last Planner System.
VisiLean
A cloud-based construction management software that integrates Lean, BIM, and the Last Planner System.
Procore
A comprehensive construction management platform with Last Planner System features.
RefinemySite
A cloud-based platform for implementing the Last Planner System and Takt Planning.
PlanGrid
A construction productivity software, now part of Autodesk Build, with features that can support LPS.
Smartapp.com
A unified construction platform with tools for Lean Last Planning and progress tracking.
vPlanner
A pull planning and scheduling software for construction projects.
Hoylu
A visual collaboration and whiteboarding software with applications for construction planning.
Sitedrive
A construction scheduling software that supports both the Last Planner System and Takt planning.
Nialli
A visual collaboration platform with a focus on replicating the physical pull planning experience.
Oracle Primavera Cloud
A comprehensive project portfolio management solution with Lean construction scheduling capabilities.
LeanKit by Planview
An enterprise Kanban tool that can be adapted for Last Planner System workflows.
Lean PlanDo
A web-based software for implementing the Last Planner System in construction projects.
KYP Project
A digital lean scheduling software for construction.
Asta Connect
A collaborative task management tool from Elecosoft that uses Last Planner System principles.
Specter Automation
A construction software that integrates Lean, BIM, and the Last Planner System.
Tactplan
A web-based scheduling tool that integrates Location-Based Scheduling, Last Planner System, and Takt Planning.
Yolean
A visual planning and management tool that supports the Last Planner System.